Rooftop Solar and Net Metering in Sylhet
Net metering lets you use your own rooftop solar power and set exported surplus against your bill. In October 2026 a new Ordinance put net metering into primary law and created OPEX and CAPEX models for systems up to 5 MW. This note explains the rules and the contracts for Sylhet owners.

Key takeaways
- The Special Solar Power Installation Ordinance 2026 took effect on 19 October 2026.
- It covers rooftop and similar solar systems of up to 5 MW, including households and tea gardens.
- OPEX service-provider models have priority; CAPEX ownership is also allowed.
- A tripartite standard contract binds customer, service provider and authority.
- The 2018 net metering guidelines still supply billing and technical detail.
What net metering means for a Sylhet rooftop
Net metering lets an electricity customer generate solar power on their own roof or premises, use it first, export any surplus to the grid through a two-way meter, and have the exported units set off against the units they import on their electricity bill. If, after that set-off, a surplus remains, the customer is entitled to be paid for it at the applicable tariff. That definition is now in primary law: the Special Solar Power Installation Ordinance 2026 (Ordinance No. 39 of 2026, dated 19 October 2026) defines net metering in those terms and builds a new framework for rooftop solar around it.
The detailed technical and billing rules still come from the Power Division's Net Metering Guidelines 2018, amended in 2019, and from each distribution utility.

For homeowners, factory owners, hospitals, schools and tea estates in the Sylhet division, the combination of the 2026 Ordinance and the existing guidelines makes rooftop solar easier to finance and connect than before. But the documents interact in ways that matter: who owns the system, who signs which contract, what happens to surplus power, and which approvals are needed. This note sets out the current position as at November 2026.
The Special Solar Power Installation Ordinance 2026
The President made the Ordinance under Article 93(1) of the Constitution while Parliament was not in session, and it took effect immediately. Its key features are:
| Feature | What the Ordinance says | Section |
|---|---|---|
| Scope | "Special solar systems" of up to 5 MW on the roofs, yards or suitable sites of government, semi-government, autonomous, local government and government-company buildings and household buildings, including solar irrigation pumps, solar cold stores, EV charging, tea-garden roofs and adjoining fallow land, floating solar and agro-voltaic systems; large land-based solar is excluded | s.2(ট) |
| Overriding effect | The Ordinance prevails over other laws | s.3 |
| Investment models | OPEX model (a service provider funds, installs and operates; output or value is shared under contract) has priority; bodies with their own funds or regular income may use the CAPEX model (they buy and own the system) | s.4 |
| Service providers | District-wise lists of eligible service providers, enrolled on payment of a fee; customers select competitively, or may use an open tender instead | s.5 |
| Contract | A tripartite agreement between the customer, the service provider and the appropriate authority, on a standard form fixed by the government | s.6 |
| Procurement | Special rules overriding the Public Procurement Act 2006 and Public Procurement Rules 2025, including a Tk 5 crore limit for limited tendering under the CAPEX model and no mandatory e-GP | s.7 |
| Monitoring | SREDA keeps data on all special solar systems and monitors whether they are working | s.8 |
| Incentives | The government may announce net metering incentives | s.9 |
| Coordination | A National Policy Council chaired by the Prime Minister, and district technical and coordination committees chaired by the Deputy Commissioner | ss.10–11 |
The standard tripartite contract must cover, among other things, the customer's rights over the site, technical and safety standards, e-waste handling and a take-back scheme for expired equipment, how generated power is shared and how surplus is managed, the customer's minimum share of output, tariffs for extra use, maintenance responsibilities, net metering billing and set-off, and dispute resolution and what happens to the system at the end of the contract (section 6(2)).
How net metering works under the 2018 guidelines
The Power Division's Net Metering Guidelines, issued in November 2018 on an experimental basis and amended in 2019 according to SREDA's National Solar Help Desk, supply the operational detail. As published in 2018, they provided that:
- Eligibility. Existing utility customers without arrears, in the residential, commercial and industrial categories, using renewable energy at the point of consumption and exporting only the excess, could apply (clauses 3.1–3.2). The 2018 text was written for three-phase consumers.
- Size. The system's AC output was capped at 70% of the sanctioned load, with an overall cap of 3 MW (clause 3.3).
- Billing. Billing is monthly; net exports are credited and carried forward within the settlement period, which is the fiscal year ending in June. Demand and fixed charges are always payable (clauses 3.4–3.5).
- Year-end surplus. Any remaining net export at the end of the settlement period is paid for at the utility's bulk purchase rate set by the energy regulator (clause 3.4(vii)).
- Metering. A bidirectional meter at the interconnection point, procured and maintained by the utility, with the cost borne by the consumer (clause 3.6).
- Process. Application to the utility, approval within ten working days, installation within eight months, then verification and a contract within fifteen days of the completion checklist (clause 3.7).
Because the guidelines were amended in 2019 and the 2026 Ordinance now overrides inconsistent rules, some of these figures may have changed. Ask your distribution utility for the version it currently applies before you size a system or sign a contract. Reports in September 2026 also described a separate government incentive tariff for surplus power from systems with battery storage installed by a cut-off date; we have not seen the underlying notification, so confirm whether, and on what terms, it applies to your installation.
Size the system to your consumption, not your roof. Under net metering, value comes mainly from offsetting your own imports at the retail rate; year-end surplus has historically been paid at a lower bulk rate. A system far larger than your annual use may not pay back as expected unless an announced incentive tariff applies to you.
Who does what in the Sylhet division
Customers in the division are served by different distribution utilities depending on location — urban areas and rural areas are served by different licensees — and the net metering application goes to the utility that bills you. The district technical and coordination committee under section 11 of the Ordinance, chaired by the Deputy Commissioner and including the police, local government engineers, the divisional forest officer and the heads of the distribution utilities, coordinates implementation at district level. SREDA maintains the national data and certifies equipment models, and the 2018 guidelines require SREDA certification for inverters, charge controllers and net meters (clause 3.8).
Our page on power and renewable energy projects covers larger projects that fall outside the 5 MW "special solar" category.
Getting connected: a step-by-step route
For a typical Sylhet home or business, the route to a net metering connection looks like this:
- Check your account. Confirm that your electricity account is in the right name, that there are no arrears, and what your sanctioned load and phase are. Arrears or an account in a deceased relative's name will hold up any application; update the account first.
- Choose a model. Decide between CAPEX (you buy and own) and OPEX (a listed service provider funds and operates). Ask the distribution utility or the district committee for the current list of service providers for your district.
- Get proposals. Under section 5 of the Ordinance, customers select a service provider competitively from the list; obtain at least two proposals and compare guaranteed output, price per unit and contract term.
- Check the roof and title. Have the structure assessed and confirm that you have the right to grant roof use: ownership documents, co-owner consents and, for tenants, the landlord's written permission.
- Apply to the utility. Submit the net metering application with supporting documents. Under the 2018 guidelines the utility was to approve within ten working days of a complete application.
- Sign the tripartite agreement. Use the government's standard contract form under section 6, completed for your site.
- Install and verify. Install SREDA-certified equipment, submit the completion checklist and have the bidirectional meter installed and the system verified.
- Keep records. Keep bills, export statements and maintenance logs; they are the evidence in any later dispute about credits or performance.
Contracts, ownership and risk
The OPEX model is attractive because the customer pays nothing up front, but it creates a long-term relationship over the customer's roof. Points to negotiate or check include:
- Roof rights. How long the service provider may occupy the roof, access rights, and what happens if the building is sold, extended or redeveloped.
- Output share. The customer's guaranteed minimum share of generation and the tariff for any extra power the customer uses.
- Performance. Who bears the loss if output falls short, and what maintenance standards apply.
- Insurance and damage. Who insures the panels and the building against storm, flood and fire damage.
- End of term. Whether the system transfers to the customer, is removed, or is renewed, and who handles e-waste under the take-back scheme.
For tenants, the landlord's consent is essential, and a lease should say who owns the system and who receives the credits. For co-owned family buildings — common in Sylhet city where several heirs share a house — all co-owners should agree in writing before a long-term roof agreement is signed. Our guide to commercial leases and tenancy explains how to document this.
Illustration (hypothetical): a family in London owns a four-storey building in Zindabazar let to shops and flats. A service provider offers an OPEX rooftop system with net metering. Before signing, the family should confirm that all heirs agree, that the shop leases do not give tenants roof rights, that the contract's term fits any plan to add a floor, and that the guaranteed share of power and the treatment of surplus are clear. A power of attorney held by a relative in Sylhet should expressly cover signing such an agreement.
Tea estates, factories and institutions
The Ordinance expressly includes tea-garden roofs and adjoining fallow land, solar irrigation pumps and solar cold stores — all relevant to the division's agricultural economy. For a tea estate holding government land on lease, check that the lease permits solar installations on fallow land, as installing equipment on leased land may need the lessor's consent; our page on tea estate land leases explains the lease structure. Factories should also check whether adding generation affects their environmental clearance or electrical safety approvals. Schools, madrasas, hospitals and local government bodies that use public funds benefit from the Ordinance's special procurement rules, but must still follow the standard contract form.
How TRW & Co helps
We advise homeowners, landlords, businesses, tea estates and institutions on rooftop solar and net metering, including OPEX and CAPEX structures, tripartite agreements, roof and lease rights, co-owner consents, and utility and regulatory requirements. We review contracts before signature and act in disputes over performance, billing and termination. Owners abroad can instruct us by email at info@trw.co; our Sylhet office is at Surma Tower, opposite the Judge Court. Please contact us, and see our note on working as a contractor on energy projects for procurement issues.
Frequently asked questions
What is net metering?
A two-way metering and billing arrangement under which a customer uses solar power generated on site, exports surplus to the grid, and has exported units set off against imported units on the bill. Under the 2026 Ordinance's definition, any surplus left after set-off is paid for at the tariff set by the government.
Can households in Sylhet use the 2026 Ordinance?
Yes. The definition of a special solar system in section 2 includes household buildings as well as government, local government and institutional buildings, tea-garden roofs and adjoining fallow land, up to 5 MW. Large land-based solar farms are excluded and follow the ordinary power-sector rules.
Do I have to buy the system myself?
No. Under section 4, the OPEX model has priority: a listed service provider funds, installs and operates the system, and output or its value is shared under a tripartite contract. Bodies with their own funds or regular income may instead use the CAPEX model and own the system outright.
How is surplus power paid for?
Under the 2018 guidelines, monthly exports are credited and carried forward within the fiscal year, and any surplus at year end is paid at the utility's bulk purchase rate. The 2026 Ordinance allows the government to announce net metering incentives, so check the tariff your utility currently applies.
What should a landlord or co-owner check before signing?
All co-owners should consent in writing, leases should not already grant roof rights to tenants, and the contract's term should fit plans to sell or extend the building. Check output guarantees, maintenance, insurance and end-of-term arrangements, including e-waste take-back under the standard contract.