Power and Renewable Energy Projects in Sylhet

Power and renewables projects in Sylhet run on national law: the Electricity Act 2018, BERC licensing, SREDA and, since October 2026, a special solar ordinance. This guide explains who regulates what, how PPAs and OPEX solar contracts work, and the land and environmental issues that decide whether a project in the division succeeds.

10 min read Updated

Key takeaways

  • The 2010 fast-track power procurement Act was repealed with effect from 28 November 2024.
  • BERC licenses generation and distribution and sets tariffs under the 2003 Act.
  • The Special Solar Installation Ordinance 2026 favours OPEX-model solar on roofs, premises and water bodies.
  • Ordinances lapse unless approved by Parliament, so check status before relying on one.
  • Solar in haors needs the haor department's opinion and must respect the 2026 haor law.
  • Treat roof-access OPEX contracts like leases, with clear terms on sale and removal.

Power and renewables projects in Sylhet, whether a utility-scale solar park, a gas-fired plant, a factory's captive generator or rooftop panels on a school, sit within a national framework rather than a local one. The core statutes are the Electricity Act 2018 (Act No. 7 of 2018), the Bangladesh Energy Regulatory Commission Act 2003, which gives the regulator its licensing and tariff powers, and the Sustainable and Renewable Energy Development Authority Act 2012, which created SREDA to promote renewable energy and efficiency. Two recent changes matter a great deal: the special fast-track law of 2010 for power procurement has been repealed, and in October 2026 an ordinance was made to speed up solar installation on buildings and similar sites.

Rooftop solar panels on a Sylhet building illustrating power and renewables projects in the division
Solar and grid infrastructure in the Sylhet division is governed by national power-sector law.

Local factors still shape every project. Land in the division is fragmented, much of it is haor, hill, forest or tea-estate land with special protection, and many landowners live abroad. A project that is straightforward on paper can be delayed for months by an unclear title, an access road over khas land or an objection from neighbours. This page explains the regulatory map, the main contracts, the 2026 solar ordinance and the land and environmental issues that arise for power and renewables in the division, as the law stood on the official Laws of Bangladesh website in November 2026.

Who regulates what

Responsibility in the power sector is split between policy-makers, a regulator, state utilities and specialist agencies. Investors need to know which body controls each decision, because approvals are sequential and one missing letter can hold up the rest.

BodyRole relevant to projects
Power Division, Ministry of Power, Energy and Mineral ResourcesSector policy, project approval for public procurement, the 2026 solar ordinance's "appropriate authority" bodies sit under it
Bangladesh Energy Regulatory Commission (BERC)Licences for generation, transmission and distribution under the 2003 Act; tariff determination
SREDARenewable energy promotion, data and monitoring; under the 2026 ordinance it keeps records of special solar systems
Bangladesh Power Development Board and other state buyersCounterparties to power purchase agreements
Power Grid BangladeshHigh-voltage transmission and grid connection
Distribution utilities and Palli Bidyut SamitiesLocal distribution, connections and net-metering arrangements
Department of EnvironmentEnvironmental clearance under section 12 of the 1995 Act
Deputy CommissionerLand acquisition, requisition, khas land and local permissions

Captive generation and industrial users

Many factories, tea estates and hotels in the division run their own generators, either as standby or as the main supply. Captive generation raises its own questions: whether a licence or permission is needed for the capacity and fuel involved, how gas connections are allocated and priced, environmental clearance for the generator and its emissions, and safety inspection. A business that moves from diesel or gas to solar, or combines them, should check that its connection agreement with the utility allows the new configuration, and that any net-metering or export arrangement is properly documented.

Utility-scale projects after the 2010 Act repeal

For fourteen years, the Quick Enhancement of Electricity and Energy Supply (Special Provisions) Act 2010 allowed power and energy projects to be procured through special negotiation and protected decisions under it from challenge in court. That Act was repealed first by an ordinance in 2024 and then by the repealing Act of 2026 (Act No. 18 of 2026), which is deemed to have taken effect on 28 November 2024. New projects therefore proceed through the ordinary procurement and approval framework, and the contracts signed under the old Act have attracted review.

A typical independent power project involves a power purchase agreement with the state buyer, an implementation agreement with the government, a land lease or acquisition arrangement, a generation licence from BERC, environmental clearance and grid-connection agreements. For a solar park, the tariff, the deemed-energy provisions (what happens if the grid cannot take the power) and the currency of payment are the commercial heart of the deal.

Key PPA terms to negotiate

  • Tariff and indexation: the price per unit, any escalation and the currency of payment.
  • Curtailment and deemed energy: compensation when the grid or buyer cannot take available power.
  • Payment security: letters of credit, government guarantees or escrow arrangements.
  • Change in law: relief if taxes, duties or regulations change after signing, a live issue given the pace of legal change since 2024.
  • Termination and buy-out: what is paid, and by whom, on early termination.
  • Dispute resolution: negotiation, expert determination and arbitration under the Arbitration Act 2001 or an international rule set.

Buying into an existing project

Investors acquiring an interest in an operating plant should look closely at how the project was procured. Contracts concluded under the repealed 2010 Act remain contracts, but the repeal removed the special protection that Act gave, and the government has reviewed a number of power-sector agreements since 2024. Due diligence should cover the PPA and any amendments, payment history and receivables, the licence and its conditions, environmental clearance and compliance, land title for the plant and access routes, and any pending disputes or reviews.

Rooftop solar, net metering and the 2026 special solar ordinance

Smaller power and renewables installations follow a different path. Rooftop systems on homes, factories and commercial buildings connect to the distribution network under net-metering arrangements, which allow surplus electricity to be exported and offset against consumption. The details, including system size limits and the process for a bidirectional meter, are set by the distribution utility under government guidelines. Our insight on rooftop solar and net metering takes householders and businesses through the steps.

The Special Solar Installation Ordinance 2026 (Ordinance No. 39 of 2026, dated 19 October 2026) aims to accelerate what it calls "special solar systems". Its main features, as published, are:

  • Suitable places: building roofs and premises, fallow land next to buildings, and water bodies (section 2).
  • OPEX model first: systems are to be installed on a priority basis under an operational-expenditure model, in which a service provider finances, installs, operates and maintains the system and the power or its value is shared under the contract; institutions with their own funds or regular income may instead buy systems outright under a CAPEX model (section 4).
  • Tripartite agreements and special procurement provisions (sections 6 and 7).
  • SREDA's role in keeping information and monitoring (section 8), and power to announce net-metering incentives (section 9).
  • A national policy council and local technical and coordination committees (sections 10 and 11).
  • Offences for theft of solar equipment, damage, illegal line connections and obstructing installation (sections 12 to 15).

An ordinance made while Parliament is not in session must be laid before Parliament and lapses if it is not approved within the period set by the Constitution, as happened to other ordinances in 2025 and 2026. Anyone signing an OPEX contract in reliance on the ordinance should check its status before signature and include terms that keep the contract workable if the ordinance lapses or is changed.

Practical point

In an OPEX solar contract, the building owner gives a provider long-term access to the roof or land. Treat it like a lease: define the area, term, access hours, insurance, liability for roof damage, what happens on sale of the building, and who removes the equipment at the end.

Schools, hospitals and public buildings

The ordinance's emphasis on building roofs and premises makes it especially relevant to schools, colleges, madrasas, hospitals, clinics and offices. Before an institution signs, its governing body should confirm that it has authority to grant long-term access to the building, that any landlord or government owner consents, and that the arrangement is consistent with the institution's own rules and funding conditions. Where the building belongs to a trust or waqf, the trust deed or waqf instrument may restrict such arrangements. A clear board resolution approving the contract protects both the institution and the provider.

Land, clearance and community issues for power and renewables

Land is usually the critical path for power and renewables in the division. Private projects lease or buy land; public projects may use acquisition under the Acquisition and Requisition of Immovable Property Act 2017, with compensation assessed under that Act. Solar parks need large contiguous areas, which in Sylhet often means assembling many small plots, some owned by heirs abroad who must sign through registered powers of attorney.

Environmental clearance is required under section 12 of the 1995 Act, and further controls apply in sensitive places. Floating or ground-mounted solar in a haor engages the Haor and Wetland Conservation Act 2026, whose section 13 prohibits filling, unauthorised excavation and structures that obstruct natural water flow, and whose section 14 requires the haor department's opinion for development projects. Tea-estate land is held under government leases with use restrictions, and forest land is protected by forest law. Transmission routes raise questions about compensation for land, crops and trees under the line. See our page on environmental clearance for the process.

Leasing land for power and renewables: a checklist

  1. Verify title through the latest khatian, mutation records and the chain of deeds for every plot.
  2. Confirm the land class and check for khas, forest, haor, water-body or tea-estate status.
  3. Agree a lease term that matches the PPA term plus construction and decommissioning time.
  4. Provide for rent review, payment method (including payment to owners abroad) and taxes.
  5. Secure access and cable or line routes by registered easement or lease.
  6. Register the lease where registration is required, and record the lessee's rights.
  7. Set out restoration obligations at the end of the term.

Community and diaspora landowners

Projects that ignore local landowners tend to face injunction suits and complaints. Clear lease terms, fair rent reviews, careful verification of title through the khatian (record-of-rights) and mutation records, and a grievance process for neighbours all reduce that risk. For owners abroad, a project lease should be executed in person or through a properly authenticated and registered power of attorney.

Contracts, equipment and imports

Beyond the PPA, a project rests on an engineering, procurement and construction (EPC) contract, an operation and maintenance contract, equipment supply contracts and insurance. Common points of dispute include performance guarantees for panels and inverters, liquidated damages for delay, defects liability periods and the allocation of import risk. Solar equipment is imported through Chattogram or by land and air, and customs classification and any duty concessions affect cost; build these into the EPC price clearly.

Contractors working on power and renewables sites in the haor districts should also plan for the short dry-season working window, and the contract programme should reflect it rather than leaving the risk undefined.

Smaller buyers, such as factories commissioning rooftop systems, often sign a supplier's standard form. Before signing, check the warranty terms (product and performance), who is responsible for the net-metering application, the remedy if generation falls short, and whether the installer is responsible for structural assessment of the roof.

Payment terms deserve particular care where an OPEX provider is paid by a share of the power or by a monthly charge. The contract should specify how generation is metered, how the price is adjusted if grid tariffs change, what happens during roof repairs or building works, and how either party can verify meter readings. Disputes about readings are among the most common in small solar contracts.

Disputes and enforcement

Power-sector disputes range from tariff and payment claims against state buyers to construction claims between contractors and landowner suits over access. Large contracts usually provide for arbitration; our page on arbitration and mediation explains how arbitration works under Bangladeshi law. Regulatory decisions of BERC and government bodies can be challenged through the routes provided in the relevant statute and, where those are exhausted or unlawful action is alleged, by writ petition.

Illustration: a hypothetical garment-accessories factory near Sylhet city signs an OPEX agreement for rooftop solar. Two years later the factory is sold. The agreement says nothing about assignment, so the buyer refuses to honour it and the provider threatens to remove its equipment and claim lost revenue. A short clause requiring the seller to procure the buyer's assumption of the agreement, or providing a buy-out formula, would have prevented the dispute.

Floods are a particular risk for power and renewables assets in Sylhet. Force majeure clauses should state whether flooding is a relief event, whether payments continue during outages, and who bears the cost of raising equipment above flood levels. Insurance should be checked against the actual flood history of the site rather than a generic policy.

On the criminal side, the 2026 ordinance creates specific offences for stealing or receiving stolen solar equipment, damaging systems, making illegal line connections and obstructing installation work, and the Electricity Act 2018 deals with electricity theft and safety offences more generally.

How TRW & Co helps

We advise developers, investors, industrial users, landowners and institutions on power and renewables matters in the Sylhet division. Our work covers regulatory mapping and licensing, PPA and implementation agreement review, land assembly and title verification, roof and land leases for OPEX solar, EPC and O&M contracts, environmental clearance and haor-department consultation, and disputes in courts and arbitration. Landowners abroad whose land is sought for a project can instruct us by email at info@trw.co. Our Sylhet office is at Surma Tower, opposite the Judge Court. Please contact us to discuss a project.

Frequently asked questions

Do I need a licence to install rooftop solar in Sylhet?

Small rooftop systems for your own use generally do not need a BERC generation licence, but connecting to the grid and exporting surplus power requires the distribution utility's approval under net-metering arrangements. Larger systems, and any sale of electricity to third parties, raise licensing questions that should be checked with the regulator and the utility.

What happened to the Quick Enhancement Act?

The Quick Enhancement of Electricity and Energy Supply (Special Provisions) Act 2010 was repealed by an ordinance in 2024 and then by Act No. 18 of 2026, deemed effective from 28 November 2024. New power projects now proceed through the ordinary procurement and approval framework rather than the special negotiation route.

What is an OPEX solar model?

Under the Special Solar Installation Ordinance 2026, an OPEX model means a service provider finances, installs, operates and maintains a solar system on a suitable place, and the power or its value is shared under the contract. A CAPEX model means the institution buys and owns the system itself.

Can a solar park be built on haor land?

Only with great care. The Haor and Wetland Conservation Act 2026 prohibits filling, unauthorised excavation and structures that obstruct natural water flow in haors and wetlands, and requires the haor department's opinion before development projects. Environmental clearance is also required, and ecologically critical area restrictions may bar the project entirely.

How are disputes under a PPA resolved?

Most power purchase agreements set out a tiered process of negotiation, expert determination and arbitration, either under the Arbitration Act 2001 or an international rule set. Regulatory decisions may be challenged through statutory routes or, where unlawful action is alleged, by writ petition in the High Court Division.

Sources

  1. Special Solar Installation Ordinance 2026
  2. Quick Enhancement of Electricity and Energy Supply (Special Provisions) (Repeal) Act 2026
  3. Electricity Act 2018
  4. Sustainable and Renewable Energy Development Authority Act 2012
  5. Bangladesh Haor and Wetland Conservation Act 2026

General information only, not legal advice. References to statutes, courts and authorities describe published law and practice at the date shown.